
Our Services
-Fiberglass, Cosmetic and Structural repairs/builds/modifications
-Gelcoat custom color match, painting and repairs
-Full boat detail wax and polish
-Hull and deck painting. Authorized Awlgrip Applicator, small parts painted, Non-skid deck painting
-Varnishing and maintaining wood finishes
-Wood work, Teak decks, Plank replacement, repairs and modifications.
-Bottom painting, keel and rudder repairs, blister repairs, Structural repairs and Thru hull work.
-Systems and equipment, Bow & Stern Thruster installs, plumbing, sanitation, bilge pumps, dinghy davits, windlasses
-Diesel engine diagnostics and repairs
-Fuel tank replacing
-Depth sounders, Gps, navigation and chart plotters
-Well stocked Chandlery to keep your project on track
-Air conditioning, water maker install and repairs
-Generator service, install, diagnostics and repairs.
-
VESSEL SET-UP, AND LAUNCH. OWNER TO DELIVER VESSEL TO VEE JAY MARINE BOAT YARD ON AN AGREEABLE START DATE, AND WILL TAKE DELIVERY AT THE SAME LOCATION UPON COMPLETION OF AUTHORIZED WORK.
UP TO 25’ $325.00 MINIMUM
26’ TO 40’ $13.50 PER FOOT
41’ TO 50’ $14.50 PER FOOT
51’ TO 55’ $16.50 PER FOOT55’+ CALL FOR PRICING/AVAILABILITY
ADDITIONAL STRAPS (3-4 TOTAL) $55 each
90 MIN. LIMIT FOR SURVEYS H/O & HANG
REMOVAL OF EXCESS MARINE GROWTH $120/ HR
WASTE DISPOSAL FEE UP TO 50’ $45
16 FT BEAM MAX
EMERGENCY HAULOUTS ADDITIONAL $500
PICK UP / DELIVERY OF BOAT - CALL FOR PRICING/AVAILIBILITY
FORKLIFT FEES INCLUDING TECHNITIAN $200/Hr, ½ HR MINIMUM
ADDITIONAL FEES MAY APPLY FOR TRAVELIFT USE OVER 2 HRS. ADDITIONAL FEES MAY APPLY WHEN EXTRA TIME AND LABOR IS NEEDED TO REMOVE ITEMS SUCH AS BACKSTAYS, ANTENNAS, COVERINGS OR ADDITON OF PROTECTIVE GEAR SUCH AS CHINEBLOCKS TO LIFT VESSEL. AS WELL AS LOADING AND OFFLOADING VESSELS FOR TRANSPORTATION.
-
CONSUMABLE MATERIAL COST NOT INCLUDED IN LABOR RATES.
GENERAL LABOR- BOTTOM PREPARATION AND DETAILING $125/HR
SKILLED LABOR - FIBERGLASS, GEL COAT, TOPSIDE PAINTING, SYSTEMS $145/HR
MECHANICAL, PLUMBING , WOOD WORK $150/HR (1 hr. minimum)
WELDING $160/HR
TRAVELIFT CHARGES, BEYOND HAULOUT $300/HR, ½ HR MINIMUM
WASTE SYSTEMS - TROUBLESHOOTING AND REPAIRING WASTE SYSTEMS, TOILETS, TANKS, VACUSH ETC $160/HR (2 hr. minimum)
-
CONSUMABLE MATERIAL COST NOT INCLUDED IN LABOR RATE
TRAVEL, AND TOLLS WILL BE ADDED TO EACH OFFSITE PROJECT AS NECESSARY. COMMENCEMENT AND A CREDIT CARD OR ALTERNATIVE PAYMENT INFORMATION MUST BE PROVIDED AND KEPT ON FILE.
OFFSITE LABOR $160.00 / HR 2 HR MINIMUM
MECHANICAL DIAGNOSTIC INSPECTION & SERVICE $145.00 / HR 2HR MINIMUM
-
SINGLE PASS ABRASION UNDERWATER BODY PREPARATION, ROLLED OR SPRAYED ON ANTI-FOULING PAINT AND ALL ASSOCIATED MATERIAL. BOTTOM PAINTING DOES NOT INCLUDE THE REMOVAL OF EXCESSIVE MARINE GROWTH, FAILING PAINT, BLISTER WORK, OR DRIVELINE CLEANING.
**VJM ALSO SPECIALIZES IN RACING BOTTOMS, TOPSIDE PAINTING, AND DECK PAINTING. PLEASE CONTACT US FOR DETAILS!**
-
REPLACEMENT BOLT-ON WILL BE CHANGED ON AN AS NEEDED BASIS AT A RATE OF $25/ZINC FOR LABOR, PLUS THE LIST PRICE FOR ZINCS.
-
LAYDAYS AND STORAGE FEES MAY BE CHARGED WHEN
(A) NO VJM CONTRACT OR CHANGE ORDER WORK HAS BEEN APPROVED. (B) DO IT YOURSELF (DIY) WORK INTERFERES WITH VJM WORK,
(C) VJM WORK IS COMPLETED AND DIY WORK DELAYS LAUNCH OF VESSEL,
(D) NO VJM WORK IS BEING PERFORMED,
(E) OWNER AWAITING INSURANCE CLAIM APPROVAL,
(F) VJM IS AWAITING DEPOSITS OR PAYMENT ON PAST DUE AMOUNTS TO COMMENCE WITH PROJECT.
DRYDOCK LAYDAYS $3.50/ FOOT/ DAY
DOCKSIDE LAYDAYS $2.00/ FOOT/ DAY
PLEASE DISCUSS STORAGE NEEDS WITH YOUR PROJECT MANAGER PRIOR TO ARRIVAL. UNSCHEDULED OR UNAPPROVED LAYDAYS MAY BE CHARGED AT A MINIMUM OF TWICE THE STANDARD RATE.